KERBEY LANE CAFE - UT
๐Project Metrics
TDLR #EABPRJB2809399Project Closed
Project has been completed and closed
๐Scope of Work
new bar, new arrangement of dining layout, new finishes,new partition walls, new exterior sign and fin system
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$1.3M total๐Related City Permits
Building permits found at or near this location
ETJ new service for SFR
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
New Construction Plumbing 2595 sq. ft. ETJ
Tunnel under foundation to replace cast iron for one full bathroom kitchen and washer drain line. Total length of tunnel is approximately 50 feet. 2 access holes will be made one in the back and the second in the front. Sewer line will also be replaced from the home to the city tap connection.
Existing Electrical main service to remain will not be setting new Meter so no ESPA needed. Remove all existing existing electrical wire and devices. Re-wire home and install new devices and lighting thru out.