QTC 5TH FLOOR
QTC 5TH FLOOR is a renovation/alteration project at 4400 N.W. LOOP 410 Ste 500, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2012). The project has an estimated value of $230K.
๐Project Metrics
TDLR #EABPRJB2809904Project Closed
Project has been completed and closed
QTC 5TH FLOOR is a Renovation/Alteration project located at 4400 N.W. LOOP 410 Ste 500, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $230K. MAGI REAL ESTATE SVC. is the property owner and DREWRY MARTIN INC. is the design firm of record. The project was registered with TDLR on March 21, 2012.
โFrequently Asked Questions
What is QTC 5TH FLOOR?
QTC 5TH FLOOR is a renovation/alteration project at 4400 N.W. LOOP 410 Ste 500 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant Finishout
Is QTC 5TH FLOOR open in San Antonio?
Construction on QTC 5TH FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2012. The building is finished and very likely open.
Where is QTC 5TH FLOOR located?
QTC 5TH FLOOR is located at 4400 N.W. LOOP 410 Ste 500, San Antonio, TX, 78229, in Bexar County.
Who is the owner or developer of QTC 5TH FLOOR?
MAGI REAL ESTATE SVC. is the property owner/developer of record for QTC 5TH FLOOR, per its TDLR project registration.
Who is the architect or design firm for QTC 5TH FLOOR?
DREWRY MARTIN INC. is the design firm of record for QTC 5TH FLOOR, according to its TDLR filing.
How much does QTC 5TH FLOOR cost and how big is it?
QTC 5TH FLOOR has an estimated construction value of $230K, based on its TDLR filing.
๐Scope of Work
Interior tenant Finishout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 21, 2012
Review Complete
Inspection Complete
Closed
Apr 1, 2012