TTI, INC.
TTI, INC. is a renovation/alteration project at 4600 FULLER DR, STE 100, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2012). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB2811701Project Closed
Project has been completed and closed
TTI, INC. is a Renovation/Alteration project located at 4600 FULLER DR, STE 100, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $150K. THOMPSON REALTY INC. is the property owner and ALLIANCE ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on April 23, 2012.
โFrequently Asked Questions
What is TTI, INC.?
TTI, INC. is a renovation/alteration project at 4600 FULLER DR, STE 100 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office space build-out of vacant Ste 100, 60 percent open office
Is TTI, INC. open in Irving?
Construction on TTI, INC. is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2012. The building is finished and very likely open.
Where is TTI, INC. located?
TTI, INC. is located at 4600 FULLER DR, STE 100, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of TTI, INC.?
THOMPSON REALTY INC. is the property owner/developer of record for TTI, INC., per its TDLR project registration.
Who is the architect or design firm for TTI, INC.?
ALLIANCE ARCHITECTS INC. is the design firm of record for TTI, INC., according to its TDLR filing.
How much does TTI, INC. cost and how big is it?
TTI, INC. has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Office space build-out of vacant Ste 100, 60 percent open office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 23, 2012
Review Complete
Inspection Complete
Closed
Jun 1, 2012