BECHTEL LEVEL 04
BECHTEL LEVEL 04 is a renovation/alteration project at 5177 RICHMOND AVE Level 04, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2012). The project has an estimated value of $512K.
๐Project Metrics
TDLR #EABPRJB2814026Project Closed
Project has been completed and closed
BECHTEL LEVEL 04 is a Renovation/Alteration project located at 5177 RICHMOND AVE Level 04, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $512K. PMRG is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on June 4, 2012.
โFrequently Asked Questions
What is BECHTEL LEVEL 04?
BECHTEL LEVEL 04 is a renovation/alteration project at 5177 RICHMOND AVE Level 04 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office space.
Is BECHTEL LEVEL 04 open in Houston?
Construction on BECHTEL LEVEL 04 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2012. The building is finished and very likely open.
Where is BECHTEL LEVEL 04 located?
BECHTEL LEVEL 04 is located at 5177 RICHMOND AVE Level 04, Houston, TX, 77056, in Harris County.
Who is the owner or developer of BECHTEL LEVEL 04?
PMRG is the property owner/developer of record for BECHTEL LEVEL 04, per its TDLR project registration.
Who is the architect or design firm for BECHTEL LEVEL 04?
ABEL DESIGN GROUP is the design firm of record for BECHTEL LEVEL 04, according to its TDLR filing.
How much does BECHTEL LEVEL 04 cost and how big is it?
BECHTEL LEVEL 04 has an estimated construction value of $512K, based on its TDLR filing.
๐Scope of Work
Renovation of existing office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 4, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2012