RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD is a renovation/alteration project at 11911 BURNET RD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2012). The project has an estimated value of $75K.
Project has been completed and closed
RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD is a Renovation/Alteration project located at 11911 BURNET RD, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $75K. RANDOLPH BROOKS FEDERAL CREDIT UNION is the property owner and CHESNEY MORALES is the design firm of record. The project was registered with TDLR on June 7, 2012.
RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD is a renovation/alteration project at 11911 BURNET RD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel of approximately 3,000 s.f.
Construction on RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2012. The building is finished and very likely open.
RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD is located at 11911 BURNET RD, Austin, TX, 78758, in Travis County.
RANDOLPH BROOKS FEDERAL CREDIT UNION is the property owner/developer of record for RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD, per its TDLR project registration.
CHESNEY MORALES is the design firm of record for RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD, according to its TDLR filing.
RBFCU AUSTIN ASC PHASE 2 INTERIOR REMOD has an estimated construction value of $75K, based on its TDLR filing.
Interior Remodel of approximately 3,000 s.f.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 7, 2012
Review Complete
Inspection Complete
Closed
Oct 1, 2012
Building permits found at or near this location
Kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft.
We are abandoning the septic tank and connecting the customer to city sewer line
Express: roof decking repair shingle replacement (exempt)
Express: window replacement (like for like) door replacement (like for like exempt) siding replacement shower tile and drywall surround demo interior HVAC unit tune-up exterior condenser full replacement exterior electrical meter base full replacement with new mast installation interior panel full replacement light fixture/fan replacement outlet/switch replacement main sewer drainage cleanout replacement of all plumbing fixtures (no relocation adding or removing)
Express: window replacement (like for like) door replacement (like for like exempt) siding replacement shower tile and drywall surround demo interior HVAC unit tune-up exterior condenser full replacement exterior electrical meter base full replacement with new mast installation interior panel full replacement light fixture/fan replacement outlet/switch replacement main sewer drainage cleanout replacement of all plumbing fixtures (no relocation adding or removing)