Project has been completed and closed
SHEPHERD OF THE HILLS PRESBYTERIAN CHURC is a Renovation/Alteration project located at 5226 W. WILLIAM CANNON DR, Austin, TX 78749 in Austin, Texas. The project has an estimated value of $400K. SHEPHERD OF HILLS PRESBYTERIAN CHURCH is the property owner and STEINBOMER BRAMWELL & VRAZEL ARCHITECT is the design firm of record. The project was registered with TDLR on June 11, 2012.
SHEPHERD OF THE HILLS PRESBYTERIAN CHURC is a renovation/alteration project at 5226 W. WILLIAM CANNON DR, Austin, TX 78749 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to a portion of an existing church building and a 600 sq ft addition.
Construction on SHEPHERD OF THE HILLS PRESBYTERIAN CHURC is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2012. The building is finished and very likely open.
SHEPHERD OF THE HILLS PRESBYTERIAN CHURC is located at 5226 W. WILLIAM CANNON DR, Austin, TX 78749, Austin, TX, 78749, in Travis County.
SHEPHERD OF HILLS PRESBYTERIAN CHURCH is the property owner/developer of record for SHEPHERD OF THE HILLS PRESBYTERIAN CHURC, per its TDLR project registration.
STEINBOMER BRAMWELL & VRAZEL ARCHITECT is the design firm of record for SHEPHERD OF THE HILLS PRESBYTERIAN CHURC, according to its TDLR filing.
SHEPHERD OF THE HILLS PRESBYTERIAN CHURC has an estimated construction value of $400K, based on its TDLR filing.
Renovation to a portion of an existing church building and a 600 sq ft addition.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 11, 2012
Review Complete
Inspection Complete
Closed
Oct 1, 2012
Building permits found at or near this location
Installation of roof mount solar panels
Replacement of complete existing central heat and air system with or without duct work
replace like for like 3 ton heat pump total 9 sq ft
replace like for like 3 ton unit
Replace(2) Bard Wall Mount Systems with (2) Mitsubishi Split System Heat Pumps at an Existing Religious Assembly