SUITE 200 UNITED LENDING
SUITE 200 UNITED LENDING is a renovation/alteration project at 3429 EXECUTIVE CENTER, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $140K.
๐Project Metrics
TDLR #EABPRJB2814639Project Closed
Project has been completed and closed
SUITE 200 UNITED LENDING is a Renovation/Alteration project located at 3429 EXECUTIVE CENTER, Austin, TX 78731 in Austin, Texas. The project has an estimated value of $140K. 2011 AUSTIN OAKS LTD is the property owner and L M HOLDER III FAIA is the design firm of record. The project was registered with TDLR on June 13, 2012.
โFrequently Asked Questions
What is SUITE 200 UNITED LENDING?
SUITE 200 UNITED LENDING is a renovation/alteration project at 3429 EXECUTIVE CENTER in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel.
Is SUITE 200 UNITED LENDING open in Austin?
Construction on SUITE 200 UNITED LENDING is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
Where is SUITE 200 UNITED LENDING located?
SUITE 200 UNITED LENDING is located at 3429 EXECUTIVE CENTER, Austin, TX, 78731, in Travis County.
Who is the owner or developer of SUITE 200 UNITED LENDING?
2011 AUSTIN OAKS LTD is the property owner/developer of record for SUITE 200 UNITED LENDING, per its TDLR project registration.
Who is the architect or design firm for SUITE 200 UNITED LENDING?
L M HOLDER III FAIA is the design firm of record for SUITE 200 UNITED LENDING, according to its TDLR filing.
How much does SUITE 200 UNITED LENDING cost and how big is it?
SUITE 200 UNITED LENDING has an estimated construction value of $140K, based on its TDLR filing.
๐Scope of Work
Interior remodel.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 13, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2012
๐Related Projects
๐คSame Owner
$453K total๐๏ธSame Design Firm
$181.0M total๐Related City Permits
Building permits found at or near this location
Repair to broken sewerline in yard and across drive way . Approximately 35ft via trenching
Running Gas Line for Generator Install
Installation of a generator and automatic transfer switch
Emergency Permit. Replaced meter socket at utilities direction.
Replacement of mini-split system