BOBCAT NATION
BOBCAT NATION is a renovation/alteration project at 700 N. LBJ DR. STE 109, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2012). The project has an estimated value of $120K.
๐Project Metrics
TDLR #EABPRJB2815115Project Closed
Project has been completed and closed
BOBCAT NATION is a Renovation/Alteration project located at 700 N. LBJ DR. STE 109, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $120K. FLEMMING HJORTING FAMILY TRUST is the property owner and ARENCO DEVELOPMENT LLC is the design firm of record. The project was registered with TDLR on June 20, 2012.
โFrequently Asked Questions
What is BOBCAT NATION?
BOBCAT NATION is a renovation/alteration project at 700 N. LBJ DR. STE 109 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space for sports bar & grill.
Is BOBCAT NATION open in San Marcos?
Construction on BOBCAT NATION is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2012. The building is finished and very likely open.
Where is BOBCAT NATION located?
BOBCAT NATION is located at 700 N. LBJ DR. STE 109, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of BOBCAT NATION?
FLEMMING HJORTING FAMILY TRUST is the property owner/developer of record for BOBCAT NATION, per its TDLR project registration.
Who is the architect or design firm for BOBCAT NATION?
ARENCO DEVELOPMENT LLC is the design firm of record for BOBCAT NATION, according to its TDLR filing.
How much does BOBCAT NATION cost and how big is it?
BOBCAT NATION has an estimated construction value of $120K, based on its TDLR filing.
๐Scope of Work
Renovation of existing space for sports bar & grill.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 20, 2012
Review Complete
Inspection Complete
Closed
Oct 1, 2012
๐Related Projects
๐๏ธSame Design Firm
$490K total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
ev install
Maline 39-83745 - Install new _6.8__kW rooftop solar system to existing residential only using line side tap only.
New in ground pool (312 sqft) and concrete deck (415 sqft)
*Emergency* customer has lost half there power they have a federal pacific panel that cant be repaired. we will be installing a new meter can and Man panel
ePlan: Commercial Expedited Review -*SMART HOUSING* New Construction of Pool Amenity for Residential Apartments (79891 SF).