PHILLIPS 66 TEMPORARY HQ LEVEL 9B
PHILLIPS 66 TEMPORARY HQ LEVEL 9B is a renovation/alteration project at 3010 BRIARPARK DRIVE 190, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2012). The project has an estimated value of $2.1M.
๐Project Metrics
TDLR #EABPRJB2815635Project Closed
Project has been completed and closed
PHILLIPS 66 TEMPORARY HQ LEVEL 9B is a Renovation/Alteration project located at 3010 BRIARPARK DRIVE 190, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $2.1M. MICHAEL KENT is the property owner and HOK ARCHITECTS is the design firm of record. The project was registered with TDLR on June 29, 2012.
โFrequently Asked Questions
What is PHILLIPS 66 TEMPORARY HQ LEVEL 9B?
PHILLIPS 66 TEMPORARY HQ LEVEL 9B is a renovation/alteration project at 3010 BRIARPARK DRIVE 190 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build-out of tenant improvements
Is PHILLIPS 66 TEMPORARY HQ LEVEL 9B open in Houston?
Construction on PHILLIPS 66 TEMPORARY HQ LEVEL 9B is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2012. The building is finished and very likely open.
Where is PHILLIPS 66 TEMPORARY HQ LEVEL 9B located?
PHILLIPS 66 TEMPORARY HQ LEVEL 9B is located at 3010 BRIARPARK DRIVE 190, Houston, TX, 77042, in Harris County.
Who is the owner or developer of PHILLIPS 66 TEMPORARY HQ LEVEL 9B?
MICHAEL KENT is the property owner/developer of record for PHILLIPS 66 TEMPORARY HQ LEVEL 9B, per its TDLR project registration.
Who is the architect or design firm for PHILLIPS 66 TEMPORARY HQ LEVEL 9B?
HOK ARCHITECTS is the design firm of record for PHILLIPS 66 TEMPORARY HQ LEVEL 9B, according to its TDLR filing.
How much does PHILLIPS 66 TEMPORARY HQ LEVEL 9B cost and how big is it?
PHILLIPS 66 TEMPORARY HQ LEVEL 9B has an estimated construction value of $2.1M, based on its TDLR filing.
๐Scope of Work
Interior build-out of tenant improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 29, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2012