RESOLUTE FITNESS is a new construction project at 5145 NORTH FM 620 Suite F-130, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $200K.
Project has been completed and closed
RESOLUTE FITNESS is a New Construction project located at 5145 NORTH FM 620 Suite F-130, Austin, TX 78732 in Austin, Texas. The project has an estimated value of $200K. PROPERTY DEVELOPMENT CENTERS LLC is the property owner and ELIZABETH SALAIZ is the design firm of record. The project was registered with TDLR on July 2, 2012.
RESOLUTE FITNESS is a new construction project at 5145 NORTH FM 620 Suite F-130 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out of retail center building
Construction on RESOLUTE FITNESS is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
RESOLUTE FITNESS is located at 5145 NORTH FM 620 Suite F-130, Austin, TX, 78732, in Travis County.
PROPERTY DEVELOPMENT CENTERS LLC is the property owner/developer of record for RESOLUTE FITNESS, per its TDLR project registration.
ELIZABETH SALAIZ is the design firm of record for RESOLUTE FITNESS, according to its TDLR filing.
RESOLUTE FITNESS has an estimated construction value of $200K, based on its TDLR filing.
Interior build out of retail center building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 2, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2012
Building permits found at or near this location
Installing a New Meter in ETJ
New digital meter was not reading Austin energy sent a tech out to investigate AE tech found that the stinger wire was not terminated inside the meter can which was not required for old analog meters. AE gave client 72 hours shut down notice if repairs were not made client called us to make repairs. Repairs have been completed already. Repairs landing stinger wire to neutral lug inside meter can.
Replacement of an existing water heater
temp power for 5145 1/2 - ETJ
Installing 277/480 v 800 Amp for New Car Wash in the ETJ SP-2022-0121D