MAIN STREET HUB
MAIN STREET HUB is a renovation/alteration project at 720 BRAZOS, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $315K.
๐Project Metrics
TDLR #EABPRJB2815779Project Closed
Project has been completed and closed
MAIN STREET HUB is a Renovation/Alteration project located at 720 BRAZOS, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $315K. CAPITAL COMMERCIAL is the property owner and LAUCK GROUP is the design firm of record. The project was registered with TDLR on July 2, 2012.
โFrequently Asked Questions
What is MAIN STREET HUB?
MAIN STREET HUB is a renovation/alteration project at 720 BRAZOS in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation Alteration - Phase 1 = 11th Floor, Phase 2 =12th Floor
Is MAIN STREET HUB open in Austin?
Construction on MAIN STREET HUB is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
Where is MAIN STREET HUB located?
MAIN STREET HUB is located at 720 BRAZOS, Austin, TX, 78701, in Travis County.
Who is the owner or developer of MAIN STREET HUB?
CAPITAL COMMERCIAL is the property owner/developer of record for MAIN STREET HUB, per its TDLR project registration.
Who is the architect or design firm for MAIN STREET HUB?
LAUCK GROUP is the design firm of record for MAIN STREET HUB, according to its TDLR filing.
How much does MAIN STREET HUB cost and how big is it?
MAIN STREET HUB has an estimated construction value of $315K, based on its TDLR filing.
๐Scope of Work
Renovation Alteration - Phase 1 = 11th Floor, Phase 2 =12th Floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 2, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2012
๐Related Projects
๐คSame Owner
$592K total๐๏ธSame Design Firm
$237.9M total๐Related City Permits
Building permits found at or near this location
New 1-story single family residence 3 bedrooms/2 bathrooms attached garage covered porch and patio PUD
Harrison S356 C Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2
Replacement of an existing water heater Replace 40-gallon electric water heater Location: garage
Interior remodel of SFR
Install OH t-pole