BAYLOR BRIC PHASE 2A
BAYLOR BRIC PHASE 2A is a renovation/alteration project at 600 SOUTH LOOP DRIVE, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2013). The project has an estimated value of $12.0M.
๐Project Metrics
TDLR #EABPRJB2815821Project Closed
Project has been completed and closed
BAYLOR BRIC PHASE 2A is a Renovation/Alteration project located at 600 SOUTH LOOP DRIVE, Waco, TX 76705 in Waco, Texas. The project has an estimated value of $12.0M. BAYLOR FP&C is the property owner and PERKINS+WILL is the design firm of record. The project was registered with TDLR on July 3, 2012.
โFrequently Asked Questions
What is BAYLOR BRIC PHASE 2A?
BAYLOR BRIC PHASE 2A is a renovation/alteration project at 600 SOUTH LOOP DRIVE in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish out of 42,000 sf of laboratory, office,and administrative space.
Is BAYLOR BRIC PHASE 2A open in Waco?
Construction on BAYLOR BRIC PHASE 2A is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2013. The building is finished and very likely open.
Where is BAYLOR BRIC PHASE 2A located?
BAYLOR BRIC PHASE 2A is located at 600 SOUTH LOOP DRIVE, Waco, TX, 76705, in McLennan County.
Who is the owner or developer of BAYLOR BRIC PHASE 2A?
BAYLOR FP&C is the property owner/developer of record for BAYLOR BRIC PHASE 2A, per its TDLR project registration.
Who is the architect or design firm for BAYLOR BRIC PHASE 2A?
PERKINS+WILL is the design firm of record for BAYLOR BRIC PHASE 2A, according to its TDLR filing.
How much does BAYLOR BRIC PHASE 2A cost and how big is it?
BAYLOR BRIC PHASE 2A has an estimated construction value of $12.0M, based on its TDLR filing.
๐Scope of Work
Interior Finish out of 42,000 sf of laboratory, office,and administrative space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 3, 2012
Review Complete
Inspection Complete
Closed
Jan 1, 2013