APACHE POC 3 LEVEL 10
APACHE POC 3 LEVEL 10 is a renovation/alteration project at 1990 POST OAK BLVD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2012). The project has an estimated value of $900K.
๐Project Metrics
TDLR #EABPRJB2818088Project Closed
Project has been completed and closed
APACHE POC 3 LEVEL 10 is a Renovation/Alteration project located at 1990 POST OAK BLVD, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $900K. CASSIDY TURLEY is the property owner and ZIEGLER COOPER ARCHITECTS is the design firm of record. The project was registered with TDLR on August 15, 2012.
โFrequently Asked Questions
What is APACHE POC 3 LEVEL 10?
APACHE POC 3 LEVEL 10 is a renovation/alteration project at 1990 POST OAK BLVD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of an existing building.
Is APACHE POC 3 LEVEL 10 open in Houston?
Construction on APACHE POC 3 LEVEL 10 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2012. The building is finished and very likely open.
Where is APACHE POC 3 LEVEL 10 located?
APACHE POC 3 LEVEL 10 is located at 1990 POST OAK BLVD, Houston, TX, 77056, in Harris County.
Who is the owner or developer of APACHE POC 3 LEVEL 10?
CASSIDY TURLEY is the property owner/developer of record for APACHE POC 3 LEVEL 10, per its TDLR project registration.
Who is the architect or design firm for APACHE POC 3 LEVEL 10?
ZIEGLER COOPER ARCHITECTS is the design firm of record for APACHE POC 3 LEVEL 10, according to its TDLR filing.
How much does APACHE POC 3 LEVEL 10 cost and how big is it?
APACHE POC 3 LEVEL 10 has an estimated construction value of $900K, based on its TDLR filing.
๐Scope of Work
Interior renovation of an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 15, 2012
Review Complete
Inspection Complete
Closed
Dec 1, 2012