HILLSIDE RANCH PHASE 2
HILLSIDE RANCH PHASE 2 is a new construction project at 1410 NORTH LBJ DRIVE, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $3.7M.
๐Project Metrics
TDLR #EABPRJB2818920Project Closed
Project has been completed and closed
HILLSIDE RANCH PHASE 2 is a New Construction project located at 1410 NORTH LBJ DRIVE, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $3.7M. GEM REALTY CAPITAL INC. is the property owner and DESIGN PLUS INC. is the design firm of record. The project was registered with TDLR on August 30, 2012.
โFrequently Asked Questions
What is HILLSIDE RANCH PHASE 2?
HILLSIDE RANCH PHASE 2 is a new construction project at 1410 NORTH LBJ DRIVE in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Three 3-stpry, 1-Bedroom, apartment buildings with a total of 53 apartment. Plus a total of 51 houses, duplexes,
Is HILLSIDE RANCH PHASE 2 open in San Marcos?
Construction on HILLSIDE RANCH PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
Where is HILLSIDE RANCH PHASE 2 located?
HILLSIDE RANCH PHASE 2 is located at 1410 NORTH LBJ DRIVE, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of HILLSIDE RANCH PHASE 2?
GEM REALTY CAPITAL INC. is the property owner/developer of record for HILLSIDE RANCH PHASE 2, per its TDLR project registration.
Who is the architect or design firm for HILLSIDE RANCH PHASE 2?
DESIGN PLUS INC. is the design firm of record for HILLSIDE RANCH PHASE 2, according to its TDLR filing.
How much does HILLSIDE RANCH PHASE 2 cost and how big is it?
HILLSIDE RANCH PHASE 2 has an estimated construction value of $3.7M, based on its TDLR filing.
๐Scope of Work
Three 3-stpry, 1-Bedroom, apartment buildings with a total of 53 apartment. Plus a total of 51 houses, duplexes,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2013
๐Related Projects
๐คSame Owner
$9.6M total๐Related City Permits
Building permits found at or near this location
Construct new driveway approach of 9 FT. Fee in lieu of sidewalk paid. ***Closure will be set 100 Ft away from the intersection.
Installing a new irrigation system
Replacement of an existing water heater swapping the gas tank water heater for a similar model
Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. Kitchen and washer drain line will be rerouted to the right side of the property we will not reroute sewer line and instead tunnel under foundation in the same locations where our access holes are but tunnel from left to right of the home total length of tunnel is 55 feet and sewer line is approximately 3 feet to the tap from the home.
Replacement of complete existing central heat and air system with or without duct work Like-for-like changeout of existing vertical HVAC system (indoor and outdoor units). No structural change.
Property Owner
Design Firm
Hays County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays