FIVE GUYS BURGERS AND FRIES is a renovation/alteration project at 730 EAST HOPKINS ST #100, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2012). The project has an estimated value of $250K.
Project has been completed and closed
FIVE GUYS BURGERS AND FRIES is a Renovation/Alteration project located at 730 EAST HOPKINS ST #100, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $250K. SAN MARCOS HOPKINS-SAN MARCOS PIPE CREEK is the property owner and DUANE MEYERS ARCHITECT is the design firm of record. The project was registered with TDLR on September 5, 2012.
FIVE GUYS BURGERS AND FRIES is a renovation/alteration project at 730 EAST HOPKINS ST #100 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out for a restaurant
Construction on FIVE GUYS BURGERS AND FRIES is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2012. The building is finished and very likely open.
FIVE GUYS BURGERS AND FRIES is located at 730 EAST HOPKINS ST #100, San Marcos, TX, 78666, in Hays County.
SAN MARCOS HOPKINS-SAN MARCOS PIPE CREEK is the property owner/developer of record for FIVE GUYS BURGERS AND FRIES, per its TDLR project registration.
DUANE MEYERS ARCHITECT is the design firm of record for FIVE GUYS BURGERS AND FRIES, according to its TDLR filing.
FIVE GUYS BURGERS AND FRIES has an estimated construction value of $250K, based on its TDLR filing.
Tenant finish out for a restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 5, 2012
Review Complete
Inspection Complete
Closed
Dec 1, 2012
Building permits found at or near this location
Replace Meter and Main Service Panel
Replacement of complete existing central heat and air system with or without duct work hvac change out **This is for Unit A
Excavate 35 tunnel to repair main drain line under the house
Utility disconnect/reconnect. Tesla Backup Switch. Overhead service. AE. Meter Can does not need replacing- NO ESPA attached
New 2-story single family residence 3 bed/2.5 bath attached garage covered porch and patio green building