DR. IRWIN
DR. IRWIN is a renovation/alteration project at 6100 HARRIS PARKWAY Suite 300, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2012). The project has an estimated value of $123K.
๐Project Metrics
TDLR #EABPRJB3801422Project Closed
Project has been completed and closed
DR. IRWIN is a Renovation/Alteration project located at 6100 HARRIS PARKWAY Suite 300, Fort Worth, TX 76123 in Fort Worth, Texas. The project has an estimated value of $123K. TEXAS HEALTH RESOURCES is the property owner and ROE DESIGN GROUP LLC is the design firm of record. The project was registered with TDLR on September 29, 2012.
โFrequently Asked Questions
What is DR. IRWIN?
DR. IRWIN is a renovation/alteration project at 6100 HARRIS PARKWAY Suite 300 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to 1782 sf of medical office space
Is DR. IRWIN open in Fort Worth?
Construction on DR. IRWIN is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2012. The building is finished and very likely open.
Where is DR. IRWIN located?
DR. IRWIN is located at 6100 HARRIS PARKWAY Suite 300, Fort Worth, TX, 76123, in Tarrant County.
Who is the owner or developer of DR. IRWIN?
TEXAS HEALTH RESOURCES is the property owner/developer of record for DR. IRWIN, per its TDLR project registration.
Who is the architect or design firm for DR. IRWIN?
ROE DESIGN GROUP LLC is the design firm of record for DR. IRWIN, according to its TDLR filing.
How much does DR. IRWIN cost and how big is it?
DR. IRWIN has an estimated construction value of $123K, based on its TDLR filing.
๐Scope of Work
Renovation to 1782 sf of medical office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 29, 2012
Review Complete
Inspection Complete
Closed
Dec 1, 2012