SHOPPES ON THE LOOP
SHOPPES ON THE LOOP is a new construction project at 2250 JOE BATTLE BLVD., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $3.1M.
๐Project Metrics
TDLR #EABPRJB3802027Project Closed
Project has been completed and closed
SHOPPES ON THE LOOP is a New Construction project located at 2250 JOE BATTLE BLVD., El Paso, TX 79938 in El Paso, Texas. The project has an estimated value of $3.1M. RIVER OAKS PROPERTIES is the property owner and PATEL ARCHITECTURE is the design firm of record. The project was registered with TDLR on October 11, 2012.
โFrequently Asked Questions
What is SHOPPES ON THE LOOP?
SHOPPES ON THE LOOP is a new construction project at 2250 JOE BATTLE BLVD. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New retail center shell
Is SHOPPES ON THE LOOP open in El Paso?
Construction on SHOPPES ON THE LOOP is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
Where is SHOPPES ON THE LOOP located?
SHOPPES ON THE LOOP is located at 2250 JOE BATTLE BLVD., El Paso, TX, 79938, in El Paso County.
Who is the owner or developer of SHOPPES ON THE LOOP?
RIVER OAKS PROPERTIES is the property owner/developer of record for SHOPPES ON THE LOOP, per its TDLR project registration.
Who is the architect or design firm for SHOPPES ON THE LOOP?
PATEL ARCHITECTURE is the design firm of record for SHOPPES ON THE LOOP, according to its TDLR filing.
How much does SHOPPES ON THE LOOP cost and how big is it?
SHOPPES ON THE LOOP has an estimated construction value of $3.1M, based on its TDLR filing.
๐Scope of Work
New retail center shell
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 11, 2012
Review Complete
Inspection Complete
Closed
Jun 1, 2013
๐Related Projects
๐คSame Owner
$509.5M total๐๏ธSame Design Firm
$5.0M totalProperty Owner