5TH FLOOR SPEC SUITES
5TH FLOOR SPEC SUITES is a renovation/alteration project at 6301 GASTON AVE, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2013). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB3802882Project Closed
Project has been completed and closed
5TH FLOOR SPEC SUITES is a Renovation/Alteration project located at 6301 GASTON AVE, Dallas, TX 75214 in Dallas, Texas. The project has an estimated value of $50K. CADDO HOLDINGS is the property owner and JONES COMMERCIAL INTERIORS is the design firm of record. The project was registered with TDLR on October 27, 2012.
โFrequently Asked Questions
What is 5TH FLOOR SPEC SUITES?
5TH FLOOR SPEC SUITES is a renovation/alteration project at 6301 GASTON AVE in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finishing out of an existing space.
Is 5TH FLOOR SPEC SUITES open in Dallas?
Construction on 5TH FLOOR SPEC SUITES is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2013. The building is finished and very likely open.
Where is 5TH FLOOR SPEC SUITES located?
5TH FLOOR SPEC SUITES is located at 6301 GASTON AVE, Dallas, TX, 75214, in Dallas County.
Who is the owner or developer of 5TH FLOOR SPEC SUITES?
CADDO HOLDINGS is the property owner/developer of record for 5TH FLOOR SPEC SUITES, per its TDLR project registration.
Who is the architect or design firm for 5TH FLOOR SPEC SUITES?
JONES COMMERCIAL INTERIORS is the design firm of record for 5TH FLOOR SPEC SUITES, according to its TDLR filing.
How much does 5TH FLOOR SPEC SUITES cost and how big is it?
5TH FLOOR SPEC SUITES has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
Finishing out of an existing space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 27, 2012
Review Complete
Inspection Complete
Closed
Jan 1, 2013