FOX HEAD INC.
FOX HEAD INC. is a renovation/alteration project at 4015 I-35 SOUTH Suite #1060, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2013). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB3804208Project Closed
Project has been completed and closed
FOX HEAD INC. is a Renovation/Alteration project located at 4015 I-35 SOUTH Suite #1060, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $150K. TANGER OUTLETS is the property owner and BIG RED ROOSTER / LARRY MEYERS is the design firm of record. The project was registered with TDLR on November 20, 2012.
โFrequently Asked Questions
What is FOX HEAD INC.?
FOX HEAD INC. is a renovation/alteration project at 4015 I-35 SOUTH Suite #1060 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: (TI) TENANT UP-FIT OF EXISTING SPACE.RV250
Is FOX HEAD INC. open in San Marcos?
Construction on FOX HEAD INC. is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2013. The building is finished and very likely open.
Where is FOX HEAD INC. located?
FOX HEAD INC. is located at 4015 I-35 SOUTH Suite #1060, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of FOX HEAD INC.?
TANGER OUTLETS is the property owner/developer of record for FOX HEAD INC., per its TDLR project registration.
Who is the architect or design firm for FOX HEAD INC.?
BIG RED ROOSTER / LARRY MEYERS is the design firm of record for FOX HEAD INC., according to its TDLR filing.
How much does FOX HEAD INC. cost and how big is it?
FOX HEAD INC. has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
(TI) TENANT UP-FIT OF EXISTING SPACE.RV250
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 20, 2012
Review Complete
Inspection Complete
Closed
Feb 1, 2013
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
New pool
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]