SHI - 4TH FLOOR EXPANSION
SHI - 4TH FLOOR EXPANSION is a renovation/alteration project at 1501 SOUTH MOPAC EXPRESSWAY SUITE 400, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2013). The project has an estimated value of $868K.
๐Project Metrics
TDLR #EABPRJB3805448Project Closed
Project has been completed and closed
SHI - 4TH FLOOR EXPANSION is a Renovation/Alteration project located at 1501 SOUTH MOPAC EXPRESSWAY SUITE 400, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $868K. BRANDYWINE REALTY is the property owner. The project was registered with TDLR on December 14, 2012.
โFrequently Asked Questions
What is SHI - 4TH FLOOR EXPANSION?
SHI - 4TH FLOOR EXPANSION is a renovation/alteration project at 1501 SOUTH MOPAC EXPRESSWAY SUITE 400 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: APPROXIMATELY 45,400 SF OF INTERIOR REMODEL TO EXISTINGSHELL SPACE.
Is SHI - 4TH FLOOR EXPANSION open in Austin?
Construction on SHI - 4TH FLOOR EXPANSION is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2013. The building is finished and very likely open.
Where is SHI - 4TH FLOOR EXPANSION located?
SHI - 4TH FLOOR EXPANSION is located at 1501 SOUTH MOPAC EXPRESSWAY SUITE 400, Austin, TX, 78746, in Travis County.
Who is the owner or developer of SHI - 4TH FLOOR EXPANSION?
BRANDYWINE REALTY is the property owner/developer of record for SHI - 4TH FLOOR EXPANSION, per its TDLR project registration.
How much does SHI - 4TH FLOOR EXPANSION cost and how big is it?
SHI - 4TH FLOOR EXPANSION has an estimated construction value of $868K, based on its TDLR filing.
๐Scope of Work
APPROXIMATELY 45,400 SF OF INTERIOR REMODEL TO EXISTINGSHELL SPACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 14, 2012
Review Complete
Inspection Complete
Closed
Apr 1, 2013
๐Related Projects
๐คSame Owner
$216.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
125-amp overhead service rebuild
Construct new sidewalk of 720 LF SP-2020-0289C 2022 059967 000 00 SSI
Gas repair/restore service
125amp sub panel replacement adding surge protection. no meter work done. Austin Electric is the electric provider.
Replace the meter base 200 amp and grounding