AIR LIQUIDE is a renovation/alteration project at 2700 POST OAK BLVD SUITE 300, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2013). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB3805653Project Closed
Project has been completed and closed
AIR LIQUIDE is a Renovation/Alteration project located at 2700 POST OAK BLVD SUITE 300, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $75K. UNILEV MANAGEMENT CORP is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on December 18, 2012.
โFrequently Asked Questions
What is AIR LIQUIDE?
AIR LIQUIDE is a renovation/alteration project at 2700 POST OAK BLVD SUITE 300 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION OF EXISTING LEASE SPACE
Is AIR LIQUIDE open in Houston?
Construction on AIR LIQUIDE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2013. The building is finished and very likely open.
Where is AIR LIQUIDE located?
AIR LIQUIDE is located at 2700 POST OAK BLVD SUITE 300, Houston, TX, 77056, in Harris County.
Who is the owner or developer of AIR LIQUIDE?
UNILEV MANAGEMENT CORP is the property owner/developer of record for AIR LIQUIDE, per its TDLR project registration.
Who is the architect or design firm for AIR LIQUIDE?
GENSLER is the design firm of record for AIR LIQUIDE, according to its TDLR filing.
How much does AIR LIQUIDE cost and how big is it?
AIR LIQUIDE has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
RENOVATION OF EXISTING LEASE SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 18, 2012
Review Complete
Inspection Complete
Closed
Apr 1, 2013