MANSFIELD WATER TREATMENT PLANT
๐Project Metrics
TDLR #EABPRJB3806943Project Closed
Project has been completed and closed
๐Scope of Work
New water treatment plant with multiple buildings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$18.4M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork for Main Living
Replacement of an existing water heater Install tankless water heater
Express: replacing 7 windows and 1 door like-for-like in an existing residential home.
Falcon S404 C Left New - 2 Story SFR w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Falcon S404 C Left New - 2 Story SFR w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.