ABC AUSTIN PHASE II
ABC AUSTIN PHASE II is a renovation/alteration project at 12357-C RIATA TRACE PARKWAY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $3.3M.
๐Project Metrics
TDLR #EABPRJB3807228Project Closed
Project has been completed and closed
ABC AUSTIN PHASE II is a Renovation/Alteration project located at 12357-C RIATA TRACE PARKWAY, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $3.3M. BUDDY REED is the property owner and SMITHGROUPJJR is the design firm of record. The project was registered with TDLR on January 23, 2013.
โFrequently Asked Questions
What is ABC AUSTIN PHASE II?
ABC AUSTIN PHASE II is a renovation/alteration project at 12357-C RIATA TRACE PARKWAY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant fit out of 1-1/2 floors of a 3 story building.
Is ABC AUSTIN PHASE II open in Austin?
Construction on ABC AUSTIN PHASE II is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
Where is ABC AUSTIN PHASE II located?
ABC AUSTIN PHASE II is located at 12357-C RIATA TRACE PARKWAY, Austin, TX, 78727, in Travis County.
Who is the owner or developer of ABC AUSTIN PHASE II?
BUDDY REED is the property owner/developer of record for ABC AUSTIN PHASE II, per its TDLR project registration.
Who is the architect or design firm for ABC AUSTIN PHASE II?
SMITHGROUPJJR is the design firm of record for ABC AUSTIN PHASE II, according to its TDLR filing.
How much does ABC AUSTIN PHASE II cost and how big is it?
ABC AUSTIN PHASE II has an estimated construction value of $3.3M, based on its TDLR filing.
๐Scope of Work
Tenant fit out of 1-1/2 floors of a 3 story building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 23, 2013
Review Complete
Inspection Complete
Closed
Jun 1, 2013