KITCHEN STORE
KITCHEN STORE is a renovation/alteration project at 12918 SHOPS PARKWAY Suite 500, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2013). The project has an estimated value of $81K.
๐Project Metrics
TDLR #EABPRJB3807253Project Closed
Project has been completed and closed
KITCHEN STORE is a Renovation/Alteration project located at 12918 SHOPS PARKWAY Suite 500, Bee Cave, TX 78738 in Bee Cave, Texas. The project has an estimated value of $81K. CHRISTOPHER COMPANY is the property owner and JDAI is the design firm of record. The project was registered with TDLR on January 23, 2013.
โFrequently Asked Questions
What is KITCHEN STORE?
KITCHEN STORE is a renovation/alteration project at 12918 SHOPS PARKWAY Suite 500 in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial demolition and interior finish out of previouslyfinished out space.
Is KITCHEN STORE open in Bee Cave?
Construction on KITCHEN STORE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2013. The building is finished and very likely open.
Where is KITCHEN STORE located?
KITCHEN STORE is located at 12918 SHOPS PARKWAY Suite 500, Bee Cave, TX, 78738, in Travis County.
Who is the owner or developer of KITCHEN STORE?
CHRISTOPHER COMPANY is the property owner/developer of record for KITCHEN STORE, per its TDLR project registration.
Who is the architect or design firm for KITCHEN STORE?
JDAI is the design firm of record for KITCHEN STORE, according to its TDLR filing.
How much does KITCHEN STORE cost and how big is it?
KITCHEN STORE has an estimated construction value of $81K, based on its TDLR filing.
๐Scope of Work
Partial demolition and interior finish out of previouslyfinished out space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 23, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2013
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Electric work The service being upgraded is suite #300B. We are taking out wire panel A and B ( before 100 Amp for each ) and then running the EMT 2 conduit from the disconnect to the meter base Suite # 300B then to the 480V pane
Electrical work I have removed all the wires in the 300 As conduit the 300 A electric meter is no longer available. We installed 3/0 wire for the 300 B electric meter. Previously 300A and 300B were 2 separate shops the electricity meter was 100 amp each side I took all the wires from the 300 A meter inside the shop. we installed disconnect 200 amp plus pre-existing electric meter 300B
Replacement of an existing water heater ETJ
Replace burned meter socket to existing commerical. EUD. Permit required per Austin Energy.
Change out hvac system to res only.