CIS, INC.
CIS, INC. is a renovation/alteration project at 11612 BEE CAVE ROAD Suite 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2013). The project has an estimated value of $62K.
๐Project Metrics
TDLR #EABPRJB3808781Project Closed
Project has been completed and closed
CIS, INC. is a Renovation/Alteration project located at 11612 BEE CAVE ROAD Suite 100, Austin, TX 78735 in Austin, Texas. The project has an estimated value of $62K. LINCOLN PROPERTY COMPANY is the property owner and JDAI is the design firm of record. The project was registered with TDLR on February 20, 2013.
โFrequently Asked Questions
What is CIS, INC.?
CIS, INC. is a renovation/alteration project at 11612 BEE CAVE ROAD Suite 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel (finishes), adding enclosed offices along perimeter and interior walls. adjust lighting and HV
Is CIS, INC. open in Austin?
Construction on CIS, INC. is complete โ TDLR records show the project passed its required accessibility inspection in May 2013. The building is finished and very likely open.
Where is CIS, INC. located?
CIS, INC. is located at 11612 BEE CAVE ROAD Suite 100, Austin, TX, 78735, in Travis County.
Who is the owner or developer of CIS, INC.?
LINCOLN PROPERTY COMPANY is the property owner/developer of record for CIS, INC., per its TDLR project registration.
Who is the architect or design firm for CIS, INC.?
JDAI is the design firm of record for CIS, INC., according to its TDLR filing.
How much does CIS, INC. cost and how big is it?
CIS, INC. has an estimated construction value of $62K, based on its TDLR filing.
๐Scope of Work
Interior remodel (finishes), adding enclosed offices along perimeter and interior walls. adjust lighting and HV
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 20, 2013
Review Complete
Inspection Complete
Closed
May 1, 2013
๐Related Projects
๐คSame Owner
$1.28B total๐Related City Permits
Building permits found at or near this location
EXPRESS: Foundation repair
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work 1.5 ton vertical gas system
Installation of a Charepoint charger to be hardwired next to 200A main panel with #6 wire
Replacement of an existing water heater