THE METHODIST HOSPITAL SCURLOCK 3 UPS AD
THE METHODIST HOSPITAL SCURLOCK 3 UPS AD is a renovation/alteration project at 6560 FANNIN ST. THIRD FLOOR, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2013). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB3809288Project Closed
Project has been completed and closed
THE METHODIST HOSPITAL SCURLOCK 3 UPS AD is a Renovation/Alteration project located at 6560 FANNIN ST. THIRD FLOOR, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $150K. TMH MEDICAL OFFICE BUILDING is the property owner and FKP ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on February 28, 2013.
โFrequently Asked Questions
What is THE METHODIST HOSPITAL SCURLOCK 3 UPS AD?
THE METHODIST HOSPITAL SCURLOCK 3 UPS AD is a renovation/alteration project at 6560 FANNIN ST. THIRD FLOOR in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate one room of level 3 in a medical office building to house a UPS system to serve BSL3 lab exhaust fans a
Is THE METHODIST HOSPITAL SCURLOCK 3 UPS AD open in Houston?
Construction on THE METHODIST HOSPITAL SCURLOCK 3 UPS AD is complete โ TDLR records show the project passed its required accessibility inspection in May 2013. The building is finished and very likely open.
Where is THE METHODIST HOSPITAL SCURLOCK 3 UPS AD located?
THE METHODIST HOSPITAL SCURLOCK 3 UPS AD is located at 6560 FANNIN ST. THIRD FLOOR, Houston, TX, 77030, in Harris County.
Who is the owner or developer of THE METHODIST HOSPITAL SCURLOCK 3 UPS AD?
TMH MEDICAL OFFICE BUILDING is the property owner/developer of record for THE METHODIST HOSPITAL SCURLOCK 3 UPS AD, per its TDLR project registration.
Who is the architect or design firm for THE METHODIST HOSPITAL SCURLOCK 3 UPS AD?
FKP ARCHITECTS INC. is the design firm of record for THE METHODIST HOSPITAL SCURLOCK 3 UPS AD, according to its TDLR filing.
How much does THE METHODIST HOSPITAL SCURLOCK 3 UPS AD cost and how big is it?
THE METHODIST HOSPITAL SCURLOCK 3 UPS AD has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Renovate one room of level 3 in a medical office building to house a UPS system to serve BSL3 lab exhaust fans a
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 28, 2013
Review Complete
Inspection Complete
Closed
May 1, 2013