2800 BLEDSOE
2800 BLEDSOE is a renovation/alteration project at 2800 BLEDSOE ST, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2013). The project has an estimated value of $550K.
๐Project Metrics
TDLR #EABPRJB3809772Inspection Complete
Final inspection completed, awaiting project closure
2800 BLEDSOE is a Renovation/Alteration project located at 2800 BLEDSOE ST, Fort Worth, TX 76107 in Fort Worth, Texas. The project has an estimated value of $550K. TLC URBAN LLC is the property owner and BENNERT BENNER PETTIT is the design firm of record. The project was registered with TDLR on March 8, 2013.
โFrequently Asked Questions
What is 2800 BLEDSOE?
2800 BLEDSOE is a renovation/alteration project at 2800 BLEDSOE ST in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing buildings into a cold dark shellfor office tenant lease space.
Is 2800 BLEDSOE open in Fort Worth?
Construction on 2800 BLEDSOE is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2013. The building is finished and very likely open.
Where is 2800 BLEDSOE located?
2800 BLEDSOE is located at 2800 BLEDSOE ST, Fort Worth, TX, 76107, in Tarrant County.
Who is the owner or developer of 2800 BLEDSOE?
TLC URBAN LLC is the property owner/developer of record for 2800 BLEDSOE, per its TDLR project registration.
Who is the architect or design firm for 2800 BLEDSOE?
BENNERT BENNER PETTIT is the design firm of record for 2800 BLEDSOE, according to its TDLR filing.
How much does 2800 BLEDSOE cost and how big is it?
2800 BLEDSOE has an estimated construction value of $550K, based on its TDLR filing.
๐Scope of Work
Renovation of existing buildings into a cold dark shellfor office tenant lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 8, 2013
Review Complete
Inspection Complete
Jul 1, 2013
Closed