2800 SUMMIT
2800 SUMMIT is a renovation/alteration project at 2800 SUMMIT, Plano, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $2.2M.
๐Project Metrics
TDLR #EABPRJB3810602Project Closed
Project has been completed and closed
2800 SUMMIT is a Renovation/Alteration project located at 2800 SUMMIT, Plano, TX 75074 in Plano, Texas. The project has an estimated value of $2.2M. F.G. SUMMIT LP is the property owner and ALLIANCE ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on March 22, 2013.
โFrequently Asked Questions
What is 2800 SUMMIT?
2800 SUMMIT is a renovation/alteration project at 2800 SUMMIT in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site and Shell Building Renovation / Moderazation. Denolition of existing interior spaces.
Is 2800 SUMMIT open in Plano?
Construction on 2800 SUMMIT is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
Where is 2800 SUMMIT located?
2800 SUMMIT is located at 2800 SUMMIT, Plano, TX, 75074, in Dallas County.
Who is the owner or developer of 2800 SUMMIT?
F.G. SUMMIT LP is the property owner/developer of record for 2800 SUMMIT, per its TDLR project registration.
Who is the architect or design firm for 2800 SUMMIT?
ALLIANCE ARCHITECTS INC. is the design firm of record for 2800 SUMMIT, according to its TDLR filing.
How much does 2800 SUMMIT cost and how big is it?
2800 SUMMIT has an estimated construction value of $2.2M, based on its TDLR filing.
๐Scope of Work
Site and Shell Building Renovation / Moderazation. Denolition of existing interior spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 22, 2013
Review Complete
Inspection Complete
Closed
Sep 1, 2013