NETWORK & SECURITY OPERATIONS CENTER
๐Project Metrics
TDLR #EABPRJB3811099Project Closed
Project has been completed and closed
๐Scope of Work
Fire alarm, mechanical renovations to network operationscenter. Addition of unisex restroom and correction of n
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Run 28 of 1.25 poly trenched to generator
Disconnect and Reconnect (PEC) - Installation of a 200A Service Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection.
24kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Greg Mason)
Building Electric service for construction trailers[not for public use] in the Easton Park Southern Compound for construction only not for sales. 10012-1/2 FM 1625 RD Units 1 2 3 4 bluebonnet