AFNB 3RD FLOOR
AFNB 3RD FLOOR is a renovation/alteration project at 9999 BELLAIRE BLVD., SUITE 201, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB3812965Project Closed
Project has been completed and closed
AFNB 3RD FLOOR is a Renovation/Alteration project located at 9999 BELLAIRE BLVD., SUITE 201, Houston, TX 77036 in Houston, Texas. The project has an estimated value of $200K. AMERICAN FIRST NATIONAL BANK is the property owner and EDWARD TSAO ARCHITECTS is the design firm of record. The project was registered with TDLR on May 2, 2013.
โFrequently Asked Questions
What is AFNB 3RD FLOOR?
AFNB 3RD FLOOR is a renovation/alteration project at 9999 BELLAIRE BLVD., SUITE 201 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 7,670 S.F. Spce build out at 3rd floor.
Is AFNB 3RD FLOOR open in Houston?
Construction on AFNB 3RD FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is AFNB 3RD FLOOR located?
AFNB 3RD FLOOR is located at 9999 BELLAIRE BLVD., SUITE 201, Houston, TX, 77036, in Harris County.
Who is the owner or developer of AFNB 3RD FLOOR?
AMERICAN FIRST NATIONAL BANK is the property owner/developer of record for AFNB 3RD FLOOR, per its TDLR project registration.
Who is the architect or design firm for AFNB 3RD FLOOR?
EDWARD TSAO ARCHITECTS is the design firm of record for AFNB 3RD FLOOR, according to its TDLR filing.
How much does AFNB 3RD FLOOR cost and how big is it?
AFNB 3RD FLOOR has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
7,670 S.F. Spce build out at 3rd floor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 2, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013