CHRISTUS HEALTH - PHASE 6
CHRISTUS HEALTH - PHASE 6 is a renovation/alteration project at 919 HIDDEN RIDGE, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $1.1M.
๐Project Metrics
TDLR #EABPRJB3814293Project Closed
Project has been completed and closed
CHRISTUS HEALTH - PHASE 6 is a Renovation/Alteration project located at 919 HIDDEN RIDGE, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $1.1M. COLUMBIA PROPERTY TRUST is the property owner and CORGAN ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on May 23, 2013.
โFrequently Asked Questions
What is CHRISTUS HEALTH - PHASE 6?
CHRISTUS HEALTH - PHASE 6 is a renovation/alteration project at 919 HIDDEN RIDGE in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation
Is CHRISTUS HEALTH - PHASE 6 open in Irving?
Construction on CHRISTUS HEALTH - PHASE 6 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is CHRISTUS HEALTH - PHASE 6 located?
CHRISTUS HEALTH - PHASE 6 is located at 919 HIDDEN RIDGE, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of CHRISTUS HEALTH - PHASE 6?
COLUMBIA PROPERTY TRUST is the property owner/developer of record for CHRISTUS HEALTH - PHASE 6, per its TDLR project registration.
Who is the architect or design firm for CHRISTUS HEALTH - PHASE 6?
CORGAN ASSOCIATES INC. is the design firm of record for CHRISTUS HEALTH - PHASE 6, according to its TDLR filing.
How much does CHRISTUS HEALTH - PHASE 6 cost and how big is it?
CHRISTUS HEALTH - PHASE 6 has an estimated construction value of $1.1M, based on its TDLR filing.
๐Scope of Work
Interior Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 23, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013