🏁Project Closed🔧 Renovation/Alteration💵 This project involves public funds, public land, or is a Federally funded roadway project.

ELGIN ISD - MISCELLANEOUS RENOVATIONS

1002 N AVENUE C, Elgin, TX 78621, Elgin, TX, 78621
Completed100%

📊Project Metrics

TDLR #EABPRJB3814989
$1.5M
Project Value
Square Feet
Cost/SqFt
2 months
Duration
Registered:Jun 6, 2013
Start:Jun 1, 2013
Target:Aug 1, 2013
🏁

Project Closed

Project has been completed and closed

📋Scope of Work

interior renovations for security vestibules, classrooms, student commons at 3 district campuses.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
June 6, 2013
Construction Start
June 1, 2013
Expected Completion
August 1, 2013

📄Related City Permits

Building permits found at or near this location

10025 PLANTERS WOODS DR

Install 60 Amp circuit for EV wall connector in garage.

ActiveElectrical PermitSpecial Inspections ProgramDec 2025
View Details
2025-160294 EP
🔧Bedwell Electric LLC
10028 ANAHUAC TRL

New irrigation install

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-159206 PP
10025 ALTERRA PKWY UNIT 100

Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.

ActivePlumbing PermitRemodelDec 2025
View Details
2025-150231 PP
🔧STELLAR PLUMBING INC
10025 ALTERRA PKWY

o Enterprise Electrical will furnish and install new specified light fixtures. ¿ Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as specified. ¿ Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation. o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed. ¿ Per Sheet E1-01 o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install new floor boxes with Data pathway. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install data boxes and conduits. ¿ Per Sheet E1-0 Drawing Notes 5 o Enterprise Electrical will scan and concrete cutting for poke through floor box. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination. ¿ Per Sheet E1-01 Drawing Notes 2 o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers. ¿ Per Sheet E1-01 Drawing Notes 3 o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment. ¿ WH-A ¿ TP-A ¿ DOAS-1 ¿ CU-1-2 ¿ FCU1-10 ¿ FCU1-11 ¿ FCU1-12 ¿ FCU1-13 ¿ FCU1-14 ¿ FCU1-15 ¿ FCU1-16 ¿ FCU1-17 ¿ FCU1-18 ¿ FCU1-19 ¿ BS-1 ¿ BS-2 ¿ CU-1-20 ¿ FCU-1-20 ¿ CU-1-21 ¿ FCU-1-21 ¿ Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule o Enterprise Electrical will furnish and install the below listed distribution equipment. ¿ Panel H1T ¿ Panel LCLA ¿ 75 KVA Transformer ¿ Per Sheet E4.00 Electrical Riser Diagram o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes. ¿ To be determined once fire alarm drawings are furnished.

ActiveElectrical PermitUpgradeDec 2025
View Details
2025-150705 EP
🔧Enterprise Electrical
10025 ALTERRA PKWY UNIT 100

Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.

ActiveBuilding PermitRemodelNov 2025
View Details
2025-150231 BP
🔧Harvey-Cleary Builders ***MAIN***