BUGMASTER OFFICE REMODEL is a renovation/alteration project at 1912 SMITH RD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $136K.
Project has been completed and closed
BUGMASTER OFFICE REMODEL is a Renovation/Alteration project located at 1912 SMITH RD., Austin, TX 78721 in Austin, Texas. The project has an estimated value of $136K. NED EWART is the property owner and EVSTUDIO TEXAS is the design firm of record. The project was registered with TDLR on June 26, 2013.
BUGMASTER OFFICE REMODEL is a renovation/alteration project at 1912 SMITH RD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alteration of an existing office/warehouse to renovate and change warehouse space into office space. There is no
Construction on BUGMASTER OFFICE REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
BUGMASTER OFFICE REMODEL is located at 1912 SMITH RD., Austin, TX, 78721, in Travis County.
NED EWART is the property owner/developer of record for BUGMASTER OFFICE REMODEL, per its TDLR project registration.
EVSTUDIO TEXAS is the design firm of record for BUGMASTER OFFICE REMODEL, according to its TDLR filing.
BUGMASTER OFFICE REMODEL has an estimated construction value of $136K, based on its TDLR filing.
Alteration of an existing office/warehouse to renovate and change warehouse space into office space. There is no
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 26, 2013
Review Complete
Inspection Complete
Closed
Sep 1, 2013
Building permits found at or near this location
New Autofill Pool for 1912 S 3RD ST
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Two Stage Vertical Gas System
45 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - back back front
New Autofill Pool for 1912 S 3RD ST
Addition of a Manual Transfer Switch and a service disconnect to the building the MTS will be installed after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.