PIZZA HUT BRODIE
PIZZA HUT BRODIE is a renovation/alteration project at 8400 BRODIE LANE Suite 108, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $120K.
๐Project Metrics
TDLR #EABPRJB3816455Project Closed
Project has been completed and closed
PIZZA HUT BRODIE is a Renovation/Alteration project located at 8400 BRODIE LANE Suite 108, Austin, TX 78745 in Austin, Texas. The project has an estimated value of $120K. CALSTONE PARTNERS LTD is the property owner and RANDY PHILLIPS AIA is the design firm of record. The project was registered with TDLR on July 1, 2013.
โFrequently Asked Questions
What is PIZZA HUT BRODIE?
PIZZA HUT BRODIE is a renovation/alteration project at 8400 BRODIE LANE Suite 108 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing restaurant to create a Pizza Hut Wing Street
Is PIZZA HUT BRODIE open in Austin?
Construction on PIZZA HUT BRODIE is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
Where is PIZZA HUT BRODIE located?
PIZZA HUT BRODIE is located at 8400 BRODIE LANE Suite 108, Austin, TX, 78745, in Travis County.
Who is the owner or developer of PIZZA HUT BRODIE?
CALSTONE PARTNERS LTD is the property owner/developer of record for PIZZA HUT BRODIE, per its TDLR project registration.
Who is the architect or design firm for PIZZA HUT BRODIE?
RANDY PHILLIPS AIA is the design firm of record for PIZZA HUT BRODIE, according to its TDLR filing.
How much does PIZZA HUT BRODIE cost and how big is it?
PIZZA HUT BRODIE has an estimated construction value of $120K, based on its TDLR filing.
๐Scope of Work
Remodel of existing restaurant to create a Pizza Hut Wing Street
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 1, 2013
Review Complete
Inspection Complete
Closed
Sep 1, 2013
๐Related Projects
๐๏ธSame Design Firm
$29.9M total๐Related City Permits
Building permits found at or near this location
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <5 feet New 3/4 EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
Replacing panel with 200 amp and new meter can with 200 amp
Install new 8.36 kW DC rooftop solar system to existing residential
Replacement of complete existing central heat and air system with or without duct work
65 tunnel below the foundation to replace entire drain system. 3 access holes - Right back left