FULCRUM
FULCRUM is a renovation/alteration project at 2603 AUGUSTA DRIVE Suite 750, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $128K.
๐Project Metrics
TDLR #EABPRJB3816779Project Closed
Project has been completed and closed
FULCRUM is a Renovation/Alteration project located at 2603 AUGUSTA DRIVE Suite 750, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $128K. JODI BUTSCHECK is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 9, 2013.
โFrequently Asked Questions
What is FULCRUM?
FULCRUM is a renovation/alteration project at 2603 AUGUSTA DRIVE Suite 750 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant remodel of existing office space.
Is FULCRUM open in Houston?
Construction on FULCRUM is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is FULCRUM located?
FULCRUM is located at 2603 AUGUSTA DRIVE Suite 750, Houston, TX, 77057, in Harris County.
Who is the owner or developer of FULCRUM?
JODI BUTSCHECK is the property owner/developer of record for FULCRUM, per its TDLR project registration.
Who is the architect or design firm for FULCRUM?
ABEL DESIGN GROUP is the design firm of record for FULCRUM, according to its TDLR filing.
How much does FULCRUM cost and how big is it?
FULCRUM has an estimated construction value of $128K, based on its TDLR filing.
๐Scope of Work
Interior tenant remodel of existing office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 9, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013