THE TILE SHOP
THE TILE SHOP is a renovation/alteration project at 9607 RESEARCH BLVD #200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2013). The project has an estimated value of $325K.
๐Project Metrics
TDLR #EABPRJB3817218Project Closed
Project has been completed and closed
THE TILE SHOP is a Renovation/Alteration project located at 9607 RESEARCH BLVD #200, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $325K. SIMON PROPERTY GROUP L.P. is the property owner and STUDIO M ARCHITECTS is the design firm of record. The project was registered with TDLR on July 16, 2013.
โFrequently Asked Questions
What is THE TILE SHOP?
THE TILE SHOP is a renovation/alteration project at 9607 RESEARCH BLVD #200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of a remodel of an existing retail tenant space.
Is THE TILE SHOP open in Austin?
Construction on THE TILE SHOP is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2013. The building is finished and very likely open.
Where is THE TILE SHOP located?
THE TILE SHOP is located at 9607 RESEARCH BLVD #200, Austin, TX, 78759, in Travis County.
Who is the owner or developer of THE TILE SHOP?
SIMON PROPERTY GROUP L.P. is the property owner/developer of record for THE TILE SHOP, per its TDLR project registration.
Who is the architect or design firm for THE TILE SHOP?
STUDIO M ARCHITECTS is the design firm of record for THE TILE SHOP, according to its TDLR filing.
How much does THE TILE SHOP cost and how big is it?
THE TILE SHOP has an estimated construction value of $325K, based on its TDLR filing.
๐Scope of Work
Project consists of a remodel of an existing retail tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 16, 2013
Review Complete
Inspection Complete
Closed
Nov 1, 2013
๐Related Projects
๐๏ธSame Design Firm
$396.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
power pole for new house outside Austin
Tunnel sewer line repair underneath the foundation of the home roughly 5ft
Interior retail tenant improvement including finishes
Replacement of an existing water heater 50gal hybrid electric