ASPEN DENTAL
ASPEN DENTAL is a renovation/alteration project at S. BROADWAY AVENUE LOT 8-G, BLK 1010-D, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2013). The project has an estimated value of $160K.
๐Project Metrics
TDLR #EABPRJB3819132Project Closed
Project has been completed and closed
ASPEN DENTAL is a Renovation/Alteration project located at S. BROADWAY AVENUE LOT 8-G, BLK 1010-D, Tyler, TX 75701 in Tyler, Texas. The project has an estimated value of $160K. TYLER 323 BROADWAY LLC is the property owner and EXCEL ENGINEERING INC. is the design firm of record. The project was registered with TDLR on August 17, 2013.
โFrequently Asked Questions
What is ASPEN DENTAL?
ASPEN DENTAL is a renovation/alteration project at S. BROADWAY AVENUE LOT 8-G, BLK 1010-D in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out for a new dental office.
Is ASPEN DENTAL open in Tyler?
Construction on ASPEN DENTAL is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2013. The building is finished and very likely open.
Where is ASPEN DENTAL located?
ASPEN DENTAL is located at S. BROADWAY AVENUE LOT 8-G, BLK 1010-D, Tyler, TX, 75701, in Smith County.
Who is the owner or developer of ASPEN DENTAL?
TYLER 323 BROADWAY LLC is the property owner/developer of record for ASPEN DENTAL, per its TDLR project registration.
Who is the architect or design firm for ASPEN DENTAL?
EXCEL ENGINEERING INC. is the design firm of record for ASPEN DENTAL, according to its TDLR filing.
How much does ASPEN DENTAL cost and how big is it?
ASPEN DENTAL has an estimated construction value of $160K, based on its TDLR filing.
๐Scope of Work
Interior build out for a new dental office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 17, 2013
Review Complete
Inspection Complete
Closed
Nov 1, 2013