ZCOLO
ZCOLO is a renovation/alteration project at 7218 MCNEIL DRIVE Suite 300, Austin, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2013). The project has an estimated value of $110K.
๐Project Metrics
TDLR #EABPRJB4800243Project Closed
Project has been completed and closed
ZCOLO is a Renovation/Alteration project located at 7218 MCNEIL DRIVE Suite 300, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $110K. GOODWIN MANAGEMENT is the property owner and PAGE SOUTHERLAND PAGE is the design firm of record. The project was registered with TDLR on September 5, 2013.
โFrequently Asked Questions
What is ZCOLO?
ZCOLO is a renovation/alteration project at 7218 MCNEIL DRIVE Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of interior finishes at main entry and addition of one toilet fixture.
Is ZCOLO open in Austin?
Construction on ZCOLO is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2013. The building is finished and very likely open.
Where is ZCOLO located?
ZCOLO is located at 7218 MCNEIL DRIVE Suite 300, Austin, TX, 78729, in Williamson County.
Who is the owner or developer of ZCOLO?
GOODWIN MANAGEMENT is the property owner/developer of record for ZCOLO, per its TDLR project registration.
Who is the architect or design firm for ZCOLO?
PAGE SOUTHERLAND PAGE is the design firm of record for ZCOLO, according to its TDLR filing.
How much does ZCOLO cost and how big is it?
ZCOLO has an estimated construction value of $110K, based on its TDLR filing.
๐Scope of Work
Renovation of interior finishes at main entry and addition of one toilet fixture.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 5, 2013
Review Complete
Inspection Complete
Closed
Dec 1, 2013
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacing approximately 17 foot of main yard sewer line
Install/Replace Meter and Main Breaker Panel 200A Underground Service
Replacement of complete existing central heat and air system with or without duct work 4T-GAS-14S-SS (Full replacement-2ducts)
7.59KW Rooftop Solar install
Request to disconnect Need to pull meter to Add MDP on exterior of house. Underground service meter can does not need to be replaced. New Main breaker to be 200a same as existing.