WELLMED CLINIC is a additions to existing building project at 1750 ROUNDROCK AVE, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2014). The project has an estimated value of $425K.
Project has been completed and closed
WELLMED CLINIC is a Additions to Existing Building project located at 1750 ROUNDROCK AVE, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $425K. HUFFMAN BUILDERS is the property owner and DAWLEY GROUP, THE is the design firm of record. The project was registered with TDLR on September 27, 2013.
WELLMED CLINIC is a additions to existing building project at 1750 ROUNDROCK AVE in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish out of shell space in an existingbuilding
Construction on WELLMED CLINIC is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2014. The building is finished and very likely open.
WELLMED CLINIC is located at 1750 ROUNDROCK AVE, Round Rock, TX, 78681, in Williamson County.
HUFFMAN BUILDERS is the property owner/developer of record for WELLMED CLINIC, per its TDLR project registration.
DAWLEY GROUP, THE is the design firm of record for WELLMED CLINIC, according to its TDLR filing.
WELLMED CLINIC has an estimated construction value of $425K, based on its TDLR filing.
Interior tenant finish out of shell space in an existingbuilding
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 27, 2013
Review Complete
Inspection Complete
Closed
Jan 1, 2014
Building permits found at or near this location
Replacement of condenser only
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Failed copper pipe inside of slab used locating equipment and traced each line manifolds were found under the slab and unable to reach. Due to possible post tension cable breaking the slab was avoided. Rerouted two downstairs bathrooms hot side only from kitchen manifold with 3/4 and dropped down each fixture with half inch.
Replacement of complete existing central heat and air system with or without duct work Thu 8/12/2021 @ 1pm V