LAKESIDE ENERGY
LAKESIDE ENERGY is a renovation/alteration project at 1177 WEST LOOP SOUTH, STE 615, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2013). The project has an estimated value of $72K.
๐Project Metrics
TDLR #EABPRJB4802508Project Closed
Project has been completed and closed
LAKESIDE ENERGY is a Renovation/Alteration project located at 1177 WEST LOOP SOUTH, STE 615, Houston, TX 77027 in Houston, Texas. The project has an estimated value of $72K. 1177 WLS LLC is the property owner and CDI DOUGLASS PYE is the design firm of record. The project was registered with TDLR on October 15, 2013.
โFrequently Asked Questions
What is LAKESIDE ENERGY?
LAKESIDE ENERGY is a renovation/alteration project at 1177 WEST LOOP SOUTH, STE 615 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of Existing Office Space
Is LAKESIDE ENERGY open in Houston?
Construction on LAKESIDE ENERGY is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2013. The building is finished and very likely open.
Where is LAKESIDE ENERGY located?
LAKESIDE ENERGY is located at 1177 WEST LOOP SOUTH, STE 615, Houston, TX, 77027, in Harris County.
Who is the owner or developer of LAKESIDE ENERGY?
1177 WLS LLC is the property owner/developer of record for LAKESIDE ENERGY, per its TDLR project registration.
Who is the architect or design firm for LAKESIDE ENERGY?
CDI DOUGLASS PYE is the design firm of record for LAKESIDE ENERGY, according to its TDLR filing.
How much does LAKESIDE ENERGY cost and how big is it?
LAKESIDE ENERGY has an estimated construction value of $72K, based on its TDLR filing.
๐Scope of Work
Remodel of Existing Office Space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 15, 2013
Review Complete
Inspection Complete
Closed
Dec 1, 2013