EARTHFRUITS YOGURT
๐Project Metrics
TDLR #EABPRJB4804404Project Closed
Project has been completed and closed
๐Scope of Work
commercial tenant finish-out of a 1,284 SF space into ayogurt shop.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
[ETJ] Permanent Electrical Service 33 Meters + 1 HP mounted on Building 1 fed by Transformer Units to be powered: 1205 1405 1305 1302 1203 1411 1303 1406 1313 1213 1413 1403 1311 1202 1402 1301 1401 1201 1206 1211 1404 1304 1204 1306 1410 1210 1110 1106 1408 1308 1108 1310 & 1208
Excavate 15 tunnel to repair main drain line under house and Excavate 31 trench to repair main drain line in yard
New construction single-family residential 1-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 3-car garage covered front porch and covered rear patio.