LEVEL 7 SPEC SUITE
LEVEL 7 SPEC SUITE is a renovation/alteration project at 613 NW LOOP 410, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB4805651Project Closed
Project has been completed and closed
LEVEL 7 SPEC SUITE is a Renovation/Alteration project located at 613 NW LOOP 410, San Antonio, TX 78216 in San Antonio, Texas. The project has an estimated value of $100K. PACE SPECTRUM LLC is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on December 9, 2013.
โFrequently Asked Questions
What is LEVEL 7 SPEC SUITE?
LEVEL 7 SPEC SUITE is a renovation/alteration project at 613 NW LOOP 410 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish Out of an existing office space
Is LEVEL 7 SPEC SUITE open in San Antonio?
Construction on LEVEL 7 SPEC SUITE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is LEVEL 7 SPEC SUITE located?
LEVEL 7 SPEC SUITE is located at 613 NW LOOP 410, San Antonio, TX, 78216, in Bexar County.
Who is the owner or developer of LEVEL 7 SPEC SUITE?
PACE SPECTRUM LLC is the property owner/developer of record for LEVEL 7 SPEC SUITE, per its TDLR project registration.
Who is the architect or design firm for LEVEL 7 SPEC SUITE?
CARSON DESIGN ASSOCIATES is the design firm of record for LEVEL 7 SPEC SUITE, according to its TDLR filing.
How much does LEVEL 7 SPEC SUITE cost and how big is it?
LEVEL 7 SPEC SUITE has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
Finish Out of an existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 9, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2014