HMWH 5TH FLOOR IMU BUILD OUT
HMWH 5TH FLOOR IMU BUILD OUT is a renovation/alteration project at 18500 KATY FREEWAY, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2014). The project has an estimated value of $6.0M.
๐Project Metrics
TDLR #EABPRJB4806292Project Closed
Project has been completed and closed
HMWH 5TH FLOOR IMU BUILD OUT is a Renovation/Alteration project located at 18500 KATY FREEWAY, Houston, TX 77094 in Houston, Texas. The project has an estimated value of $6.0M. HOUSTON METHODIST WEST HOSPITAL is the property owner and PAGE SOUTHERLAND PAGE LLP is the design firm of record. The project was registered with TDLR on December 18, 2013.
โFrequently Asked Questions
What is HMWH 5TH FLOOR IMU BUILD OUT?
HMWH 5TH FLOOR IMU BUILD OUT is a renovation/alteration project at 18500 KATY FREEWAY in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 20,625 SF Shell space build out of the 5th floor inpatient hospital for Intermediate Care Unit
Is HMWH 5TH FLOOR IMU BUILD OUT open in Houston?
Construction on HMWH 5TH FLOOR IMU BUILD OUT is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2014. The building is finished and very likely open.
Where is HMWH 5TH FLOOR IMU BUILD OUT located?
HMWH 5TH FLOOR IMU BUILD OUT is located at 18500 KATY FREEWAY, Houston, TX, 77094, in Harris County.
Who is the owner or developer of HMWH 5TH FLOOR IMU BUILD OUT?
HOUSTON METHODIST WEST HOSPITAL is the property owner/developer of record for HMWH 5TH FLOOR IMU BUILD OUT, per its TDLR project registration.
Who is the architect or design firm for HMWH 5TH FLOOR IMU BUILD OUT?
PAGE SOUTHERLAND PAGE LLP is the design firm of record for HMWH 5TH FLOOR IMU BUILD OUT, according to its TDLR filing.
How much does HMWH 5TH FLOOR IMU BUILD OUT cost and how big is it?
HMWH 5TH FLOOR IMU BUILD OUT has an estimated construction value of $6.0M, based on its TDLR filing.
๐Scope of Work
20,625 SF Shell space build out of the 5th floor inpatient hospital for Intermediate Care Unit
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 18, 2013
Review Complete
Inspection Complete
Closed
Sep 1, 2014