๐ŸProject Closed๐Ÿ”ง Additions to Existing Building๐Ÿ’ต This project is privately funded, on private land for private use.

WELEYAN AL - PHASE 2 ADDITION

109 ESTRELLA CROSSING, Georgetown, TX 78626, Georgetown, TX, 78626
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB4806495
$2.7M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3y 2mo
Duration
Registered:Dec 20, 2013
Start:Jan 1, 2014
Target:Feb 27, 2017
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

This is an addition to the existing Assisted Living Facility. The addition will consist of 20 units.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
December 20, 2013
Project Closed
February 27, 2017
Construction Start
January 1, 2014
Expected Completion
February 27, 2017

๐Ÿ“Location & Views

Open in MapsGet Directions|30.67704, -97.70687

๐Ÿ“„Related City Permits

Building permits found at or near this location

10900 SAGE OAK CV
18.23 mi away

Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-019952 EP
๐Ÿ”งNomic Energy LLC DBA Nomic Power Solutions
10901 CATTHORN CV
18.36 mi away

(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP

ActiveElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-018139 EP
๐Ÿ”งSMART CHARGE RESIDENTAL LLC
10902 CUT PLAINS LOOP
20.59 mi away

Install Level 2 EV Charger

FinalElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-017415 EP
๐Ÿ”งCharge Pro LLC
10901 N LAMAR BLVD BLDG A
20.67 mi away

Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-015956 EP
๐Ÿ”งElectric Contractors LLC
10906 WAREHAM CT
35.48 mi away

Replacement of an existing water heater replacing an existing 40 gallon gas water heater like for like

FinalPlumbing PermitChange OutFeb 2026
View Details
2026-015381 PP
๐Ÿ”งBenjamin Franklin Plumbing

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists