THIRD FLOOR RENOVATION
THIRD FLOOR RENOVATION is a renovation/alteration project at 10415 MORADO CIRCLE BUILDING V, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2014). The project has an estimated value of $51K.
๐Project Metrics
TDLR #EABPRJB4806520Project Closed
Project has been completed and closed
THIRD FLOOR RENOVATION is a Renovation/Alteration project located at 10415 MORADO CIRCLE BUILDING V, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $51K. HB AVALLON LLC is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on December 20, 2013.
โFrequently Asked Questions
What is THIRD FLOOR RENOVATION?
THIRD FLOOR RENOVATION is a renovation/alteration project at 10415 MORADO CIRCLE BUILDING V in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to third floor lobby and restrooms, includingnew flooring and wall finishes and shower renovation to
Is THIRD FLOOR RENOVATION open in Austin?
Construction on THIRD FLOOR RENOVATION is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2014. The building is finished and very likely open.
Where is THIRD FLOOR RENOVATION located?
THIRD FLOOR RENOVATION is located at 10415 MORADO CIRCLE BUILDING V, Austin, TX, 78759, in Travis County.
Who is the owner or developer of THIRD FLOOR RENOVATION?
HB AVALLON LLC is the property owner/developer of record for THIRD FLOOR RENOVATION, per its TDLR project registration.
Who is the architect or design firm for THIRD FLOOR RENOVATION?
CARSON DESIGN ASSOCIATES is the design firm of record for THIRD FLOOR RENOVATION, according to its TDLR filing.
How much does THIRD FLOOR RENOVATION cost and how big is it?
THIRD FLOOR RENOVATION has an estimated construction value of $51K, based on its TDLR filing.
๐Scope of Work
Renovation to third floor lobby and restrooms, includingnew flooring and wall finishes and shower renovation to
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2014
๐Related Projects
๐คSame Owner
$1.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Building Sewer (yard line): Replacing 50 feet starting at the edge of the house and ends at the edge of the sidewalk at the front of the house
Replacement of an existing water heater Change Out: Install/ Replace 40 gallon tank-type natural gas water heater.
Install 16 (405W) roof mounted solar panels 6.480 kW solar service system tying into new 200 AMP rated MSP
Shut-down request for installation of MPU in correlation with AUX permit 2025-054435 EP (using existing UM)