SPIN CO. LEVEL 1
SPIN CO. LEVEL 1 is a renovation/alteration project at 3151 BRIARPARK DRIVE Suite 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2014). The project has an estimated value of $550K.
๐Project Metrics
TDLR #EABPRJB4806524Project Closed
Project has been completed and closed
SPIN CO. LEVEL 1 is a Renovation/Alteration project located at 3151 BRIARPARK DRIVE Suite 100, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $550K. GRANITE PROPERTIES INC. is the property owner and ZIEGLER COOPER ARCHITECTS is the design firm of record. The project was registered with TDLR on December 20, 2013.
โFrequently Asked Questions
What is SPIN CO. LEVEL 1?
SPIN CO. LEVEL 1 is a renovation/alteration project at 3151 BRIARPARK DRIVE Suite 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing tenant lease space.
Is SPIN CO. LEVEL 1 open in Houston?
Construction on SPIN CO. LEVEL 1 is complete โ TDLR records show the project passed its required accessibility inspection in May 2014. The building is finished and very likely open.
Where is SPIN CO. LEVEL 1 located?
SPIN CO. LEVEL 1 is located at 3151 BRIARPARK DRIVE Suite 100, Houston, TX, 77042, in Harris County.
Who is the owner or developer of SPIN CO. LEVEL 1?
GRANITE PROPERTIES INC. is the property owner/developer of record for SPIN CO. LEVEL 1, per its TDLR project registration.
Who is the architect or design firm for SPIN CO. LEVEL 1?
ZIEGLER COOPER ARCHITECTS is the design firm of record for SPIN CO. LEVEL 1, according to its TDLR filing.
How much does SPIN CO. LEVEL 1 cost and how big is it?
SPIN CO. LEVEL 1 has an estimated construction value of $550K, based on its TDLR filing.
๐Scope of Work
Renovation to existing tenant lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2013
Review Complete
Inspection Complete
Closed
May 1, 2014