THE POINT GROUP
THE POINT GROUP is a renovation/alteration project at 5949 SHERRY LANE SUITE 1800, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $270K.
๐Project Metrics
TDLR #EABPRJB4806865Project Closed
Project has been completed and closed
THE POINT GROUP is a Renovation/Alteration project located at 5949 SHERRY LANE SUITE 1800, Dallas, TX 75225 in Dallas, Texas. The project has an estimated value of $270K. KBSIII STERLING PLAZA LLC is the property owner and BENSON HLAVATY is the design firm of record. The project was registered with TDLR on January 2, 2014.
โFrequently Asked Questions
What is THE POINT GROUP?
THE POINT GROUP is a renovation/alteration project at 5949 SHERRY LANE SUITE 1800 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing interior office space.
Is THE POINT GROUP open in Dallas?
Construction on THE POINT GROUP is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is THE POINT GROUP located?
THE POINT GROUP is located at 5949 SHERRY LANE SUITE 1800, Dallas, TX, 75225, in Dallas County.
Who is the owner or developer of THE POINT GROUP?
KBSIII STERLING PLAZA LLC is the property owner/developer of record for THE POINT GROUP, per its TDLR project registration.
Who is the architect or design firm for THE POINT GROUP?
BENSON HLAVATY is the design firm of record for THE POINT GROUP, according to its TDLR filing.
How much does THE POINT GROUP cost and how big is it?
THE POINT GROUP has an estimated construction value of $270K, based on its TDLR filing.
๐Scope of Work
Renovation of existing interior office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 2, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2014