SHI - 1ST FLOOR OFFICE
SHI - 1ST FLOOR OFFICE is a renovation/alteration project at 1501 SOUTH MOPAC Suite 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB4807808Project Closed
Project has been completed and closed
SHI - 1ST FLOOR OFFICE is a Renovation/Alteration project located at 1501 SOUTH MOPAC Suite 150, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $300K. G&I VII BARTON SKYWAY LP is the property owner. The project was registered with TDLR on January 22, 2014.
โFrequently Asked Questions
What is SHI - 1ST FLOOR OFFICE?
SHI - 1ST FLOOR OFFICE is a renovation/alteration project at 1501 SOUTH MOPAC Suite 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 9,000 SF of interior remodel to existing office space
Is SHI - 1ST FLOOR OFFICE open in Austin?
Construction on SHI - 1ST FLOOR OFFICE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is SHI - 1ST FLOOR OFFICE located?
SHI - 1ST FLOOR OFFICE is located at 1501 SOUTH MOPAC Suite 150, Austin, TX, 78746, in Travis County.
Who is the owner or developer of SHI - 1ST FLOOR OFFICE?
G&I VII BARTON SKYWAY LP is the property owner/developer of record for SHI - 1ST FLOOR OFFICE, per its TDLR project registration.
How much does SHI - 1ST FLOOR OFFICE cost and how big is it?
SHI - 1ST FLOOR OFFICE has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Approximately 9,000 SF of interior remodel to existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 22, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2014
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Construct new sidewalk of 720 LF SP-2020-0289C 2022 059967 000 00 SSI
125amp sub panel replacement adding surge protection. no meter work done. Austin Electric is the electric provider.
Replace the meter base 200 amp and grounding
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton horiz heat pump system (Apt F2)