EXPRESS
EXPRESS is a renovation/alteration project at 4015 INTERSTATE 35 SOUTH Suite 337, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $70K.
๐Project Metrics
TDLR #EABPRJB4808280Project Closed
Project has been completed and closed
EXPRESS is a Renovation/Alteration project located at 4015 INTERSTATE 35 SOUTH Suite 337, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $70K. TANGER OUTLET CENTERS is the property owner and SHREMSHOCK ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on January 28, 2014.
โFrequently Asked Questions
What is EXPRESS?
EXPRESS is a renovation/alteration project at 4015 INTERSTATE 35 SOUTH Suite 337 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor remodel of the exisiting Express Store
Is EXPRESS open in San Marcos?
Construction on EXPRESS is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is EXPRESS located?
EXPRESS is located at 4015 INTERSTATE 35 SOUTH Suite 337, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of EXPRESS?
TANGER OUTLET CENTERS is the property owner/developer of record for EXPRESS, per its TDLR project registration.
Who is the architect or design firm for EXPRESS?
SHREMSHOCK ARCHITECTS INC. is the design firm of record for EXPRESS, according to its TDLR filing.
How much does EXPRESS cost and how big is it?
EXPRESS has an estimated construction value of $70K, based on its TDLR filing.
๐Scope of Work
Minor remodel of the exisiting Express Store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 28, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2014
๐Related Projects
๐คSame Owner
$5.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
New pool