METHODIST HOSPITAL - DIALYSIS/APHERESIS is a additions to existing building project at 7700 FLOYD CURL DRIVE, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $2.5M.
Project has been completed and closed
METHODIST HOSPITAL - DIALYSIS/APHERESIS is a Additions to Existing Building project located at 7700 FLOYD CURL DRIVE, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $2.5M. METHODIST HOSPITAL is the property owner and EARL SWENSSON ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on March 25, 2014.
METHODIST HOSPITAL - DIALYSIS/APHERESIS is a additions to existing building project at 7700 FLOYD CURL DRIVE in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: There is approx. 11,493 sq. ft. of new construction. Itis an addition to the existing hospital on the 1st floo
Construction on METHODIST HOSPITAL - DIALYSIS/APHERESIS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
METHODIST HOSPITAL - DIALYSIS/APHERESIS is located at 7700 FLOYD CURL DRIVE, San Antonio, TX, 78229, in Bexar County.
METHODIST HOSPITAL is the property owner/developer of record for METHODIST HOSPITAL - DIALYSIS/APHERESIS, per its TDLR project registration.
EARL SWENSSON ASSOCIATES INC. is the design firm of record for METHODIST HOSPITAL - DIALYSIS/APHERESIS, according to its TDLR filing.
METHODIST HOSPITAL - DIALYSIS/APHERESIS has an estimated construction value of $2.5M, based on its TDLR filing.
There is approx. 11,493 sq. ft. of new construction. Itis an addition to the existing hospital on the 1st floo
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 25, 2014
Review Complete
Inspection Complete
Closed
Dec 1, 2014